Changchun Longjia International Airport Phase II Expansion Project-Terminal T2

Changchun Longjia International Airport Phase II Expansion Project-Terminal T2

2023-05-18

Latest company case about Changchun Longjia International Airport Phase II Expansion Project-Terminal T2

latest company case about Changchun Longjia International Airport Phase II Expansion Project-Terminal T2  0Project Profile

Waterproofing Material: 3.0mm Bondsure® BAC Self-adhesive Bituminous Waterproofing Membrane, 1.5mm Bondsure® BAC-P Self-adhesive Bituminous Waterproofing Membrane, TUBIDING Non-curing Rubber Bitumen Waterproofing Coating

Waterproofing Area: around 90,000 ㎡

Project Position: Basement Slabs, Basement Side Walls

Honor and Award: 2018-2019 China Construction Engineering Luban Prize(National Prime-quality Project)

latest company case about Changchun Longjia International Airport Phase II Expansion Project-Terminal T2  0Project Description

The construction of Terminal T2 of Changchun Longjia International Airport began in October 2015, mainly including terminal building, viaduct project, flight area project and supporting project.

The terminal has 128,000 square meters, as well as 50,000 square meters of surface parking and 40,000 square meters of underground parking. A second parallel taxiway with a length of 1,068.5m, two fast taxiways, a vertical contact road and a 28 parking apron will be built in the airfield. Supporting projects to build power supply, water supply, heating, sewage plants and auxiliary living rooms.