Classic Engineering Projects
Projects in Overseas and Domestic Market.
2023-05-16
Waterproofing Materials: 2.0mm Bondsure® PVC Tunnel Waterproofing Membrane
Waterproofing Area: around 100,000 ㎡
Project Position: Tunnel Waterproofing
The total length of Thailand's dual-track railway is 134 kilometers, which was jointly designed by International Engineering Consultants and Amberg Infraestructuras. The project is divided into four contracts according to the content. The total contractor is Italain-Thai, which ranks the first in Thailand. Different contracts are jointly contracted with different general contractors. The construction of the project officially started in 2018. Italain-thai and Rail Tunnelling built the 12.4km tunnel project with a total investment of 9.29 billion baht (1.448 billion yuan). Among them, Ban Hin Lab has a total length of 5.2 kilometers, which is the longest railway tunnel in Thailand at present, with an overall waterproof area of about 300,000 square meters. This section of the project uses Joaboa Tech's 2.0mm PVC-H non-exposed waterproof membrane.